Hello All,
Can any body give a solution to change the configuration from operational to header production order confirmation.
I changed confirmation from CO11N to Co15. System giving a message confirmation was set to operation wise.
Hello All,
Can any body give a solution to change the configuration from operational to header production order confirmation.
I changed confirmation from CO11N to Co15. System giving a message confirmation was set to operation wise.