Quantcast
Channel: SCN: Message List
Viewing all 10498 articles
Browse latest View live

Re: Error Message 62

$
0
0

I have narrowed it down to the scheduling margin key.  When the date exceeds the opening date/time specified in the scheduling margin key, the system plans and creates the 62 message.  I don't want to open this period any more than what we have.  Any suggestions what else can be done.  Thanks.


Re: Stack file generation for SAP SRM7.0 with SAP EHP1 FOR SAP NETWEAVER 7.0

Re: security alert

$
0
0

helpful but now I get a prompt in IE that if I enter either the windows login or B1iadmin login it does not work.

SAP B1iP detected an error: Emitted HTTP-Code: 401 - Unauthorized Internal Reason: XCL199 Authentication required; further details: Recommendation: Check for the correctness of your activity or environment or ask your system-administrator for further help. -------------------------------------------------------------------------------- Full Internal Error Message: XCL199 Authentication required; further details: -------------------------------------------------------------------------------- Log-ID: LID14112123223284370152C0A803063243

Month End Accrual

$
0
0

Hi All,

 

I have given Month end accrual wage types for 21st PP. While executing Payroll for 21st PP in Payroll display log no wage type generation in ACCR table for any wage types, so in posting run also no accrual. However while executing 22nd PP in display log month end accrual -> UACGF- > ACCR - only /4WK wage type is getting generate. And again no accrual. Before this till 20th PP Accrual was generating.

 

Can anyone suggest reason behind no accrual even for 22nd PP

 

Appreciate your immediate response

 

Thanks

Rakhi

Re: security alert

$
0
0

Hi

Have you already gone through this:

 

1.1 Error HTTP 401: Unauthorized

  • Root cause 1: localhost was not added to Trusted Sites.
  • Solution 1: Add http://127.0.0.1 to Trusted Sites (Tools->Internet Options->Security tab->Trusted Sites)
  • Root cause 2: Admin account for the Integration framework is deactivated
  • Solution 2: Please refer note:1556041

 

Kind regards,

Radek

Re: Username&Password in SAPUI5

$
0
0

Hi Arjun, if you need a Login for your application the best way is reuse the Fiori Login. Read this blog for more information: Login page for custom sapui5 applications

 

In case that you want a login without making a call to backend service, the login will not be safe.

 

Regards,
Pau

Re: Legacy Balances Takeover

$
0
0

Hello,

 

Thank you for your feedback.

 

You can handle this by using additional account. Against this account you close your auxiliary accounts (FA,AR,...) which you have used for data migration.

Remember: We open one GL account for each package of data migration.

Example >> interim account AR or FA, then you and auditor can see on one glimpse that sum of data migration is shown on interim account.

 

When you make migration during the year, there is no "logical" purpose importing balance of all P/L accounts.

In my eyes it only makes sense when you import each document on cost and revenue account with CO information, you can use this next year for comparing data.

 

In the future retained earning account which is set up in SPRO will be used.

 

 

A warm advice from my side, try to get auditor on board and listen to their expectations.

If they expect that you have to migrate P/L fully you have to meet their expectations.

 

Make concept and test migration.

Test migration and concept should be approved by auditor.

 

all the best erwin

2014-11-22_19-12-52.jpg

Re: Disable Save as rpt file in SAP B1

$
0
0

thank you so mush for your answers , but in my case , I create the report and  I imported it into SAP without use the Visual studio , my need it consist to hide the rpt extension when user export it .

 

is it clear Mr.Balaji Sampath ?


Re: Problem with print preview

$
0
0

Hi julien,


I am not sure whether it will help u, but i think there is some code for Output, which runs only in Updte Task or Background Task.

 

pls check, if it helps you.

 

Thanking You All.

Re: getItems() of sap.m.Table

$
0
0

Maybe you you trying to retrieve the count before the model has data in it. Remember, the model needs to make a call to the backend services to get data.

 

Just my 2 cents worth

 

-D

Re: Unable to import files in Content Server using Authoring Tool

$
0
0

Hi Abhishek,

 

I was looking at your posts. We are also using the SAP Content Server. Can you pls guide me as to how did it work.

Wisch cetificate firts?

$
0
0

Hallo Everybody

 

I did mistake. I schould make my question different.

 

I work wiht MM, LE and SD but i am not sure, if i should make the Process Integration Certificate or a Module like MM.

Re: Report for Material storage location stock on posting date

Re: Change Subject of Reminder and Escalation Notifications for PC

$
0
0

@ Marcus/Robert,

If your issue is not solved, please find the solutions as below specific to SAP GRC PC. I'm assuming apart from subject rest configuration like scenario id , workflow configuration for reminder/escalations you have made already.

 

Login into the SAP backend, use transaction code se91 and select message class as GRPC_UI and select below message number and go to change mode :

 

Msg No:702--> Subject Line for Escalations email

Msg No:703 --> Subject Line for Reminder email

 

Put your customized customized subject line message and maintain the entry in  in SAP backend. Execute transaction code SWNCONFIG, go to General settings and make the below entry

 

SUBJECT_WF_ESCALATION (Value=NAGRPC_UI702)

SUBJECT_WF_REMINDER (Value=NAGRPC_UI703).

 

This will solve your  problem and you'll get your new subject in email.  If in case of any doubt, please feel free to reach me back on kingshon_vatsa@hotmail.com for faster response.

 

For your reference i'm also enclosing the 3 screenshot viz: SE91, SWNCONFIG, and email with customized subject line. SE91.jpgSWNCONFIG.jpgnew email.jpg

 

Cheers !!

Manish Jha

Re: How to Update the Subject of Email Notification in GRC 10 PC


Re: Error in Search Help

$
0
0

Hello Vignesh,

 

By curiosity I had a look but did not manage to reproduce this behavior.

 

Since, we are in the ABAP sub-forum, i suggest to debug the search help. I had a look but found nothing.

 

Capture.PNG

 

Start the debugger on the plant selection window, for this just create a text file on the model of the below screen capture and drag and drop it onto the window.

 

Capture.PNG

 

Before starting to go into runtime analysis, I suggest to check the value of the PID WRK....

 

Enjoy the investigation !

 

Cheers,

Alex

Re: Customs document is incompleteness and no message in communication

$
0
0

Nothing in communication tab

Communication_tab.JPG

Created messages as below

Messages.JPG

I am trying to create commercial invoice first, it should show in the customs document.

 

Regards,

Manohar.

Need RM PM Requirement qty at day wise

$
0
0

Dear Experts,

 

Thanks for your continues support.

 

I need one clarification for RM / PM Requirement qty at date wise, my company asking one of the requirement for RM / PM pls find the below requirement.

 

RM CODE

RM NAME

1st jan 2nd Jan3rd jan etc . till last date a rm is req
reqstockreqstock
AAmmonia500505300200
we need coloring as below
if stock s below requirements then red
if stock s double of requirements then violet
if stocks equal to or 5% excess of requirements then green

 

But my understanding is system first of all consider only for Missing parts, so not possible for req / stock equal & double the stock.

then system consider the requirement date for RM / PM based on the order date only not for every date wise.

 

Only thing planned order level possible the Missing parts list , But that also not correct planned is a proposal not fixed.

After changed the planed order to process order then only check the missing parts.

 

 

Standard Missing part list view

 

 

Req.qty   /   qty. withdrawal  / committed qty  / Shortfall qty ( Missing qty )

150                     50                    0                               100     - So check the Purchase order against this short fall qty of 100 EA.

 

 

Otherwise any other option is their any standard t.code ( or ) possible for any customization report at the above requirement.

Kindly guide me on this report and share any relevant t.code ( or ) table.

 

I am waiting for your valuable reply.

 

Pathy.N

Revolving LC in SD

$
0
0


Hi,

 

I have searched in forum, but could not get any answer for below requirement.

 

We have a scenario of revolving LC, following example will give better idea.

 

LC value: 1000 INR

Assigned Sales order value: 1000 INR

Open value: 0.00

 

My requirement is my LC value should be revolved once I received amount from my Customer.

 

So if I receive 1000 INR in above case, then LC value should be 1000 INR.

 

Appreciate your reply.

 

Regards

SMP

Re: Report for Material storage location stock on posting date

$
0
0

Hallo Jürgen,

 

For the performance killer I agree, although this has really improved lately with :

 

Capture.PNG

Relevant notes:

1516684 MKPF fields added to MSEG - Performance optimization

1550000 MB51: Redesign of selection for performance optimization

1558298 MB5B: Redesign of selection to optimize performance

1567602 DB dependent steps to support the redesign of MB51

1598760 FAQ: MSEG Enhancement & Redesign MB51/MB5B

 

Since the optimization brings  MKPF fields into MSEG, we have now turbocharged selects ...

 

Viewing all 10498 articles
Browse latest View live